J.T.P Har Hotzvim

Har Hotzvim property corporation (owned by J.T.P) bought the former Luz Corporation plot.

The company’s administration building, used at the early stages of the project as a rental

building for industrial uses (building A) already existed on the plot. In the first stage, a shell

building for rent (building B) was built on an area of approximately 28,000 square meters

and a parking garage with 1,000 spaces.

This building was planned as an efficient shell for the rental of spaces for offices and high

tech industries. The depth of the story is 33 meters and its length is 180 meters. 3 separate

entrance areas were built allowing division and flexibility in the size of the rental unit. Due to

topography, the roof of the parking structure serves as an entry courtyard to this building, at

street level. The courtyard is vegetated, and in conjunction with the roof of building A

constitutes a large continuous courtyard that comprises most of the open area for the entire

project. After completing the first phase, the office was invited to realize the existing building

rights and expand them by an additional 25,000 square meters. after the city plan was

approved, an additional building (C/D) was built, comprising of a 19-story tower and an

additional 3-story wing. From this building, the main entrance to the project was planned

from which there would be access to each of the plot’s built components.

The tower was planned as an efficient tower for rental to high tech industries in a simple

33×33 meter square plan. The floor was planned as an efficient floor with a low gross/net

ratio allowing a range of division options. The relatively “short” tower required architectural

means to enhance its verticality, for that purpose the main facades were split using glazed

screens with the emphasized vertical division.

The glazing, on the south and west facades, was planned with a fixed shading system

hanging in front of it. This system prevents the sun heating of the glass screen and thus

saves a great deal of energy in cooling the building on hot days. This is the first tall

building in Israel where a shading screen was installed over the entire facade.

In addition to saving energy, the screen provides an accessible system allowing simple

cleaning of the glass. At the construction phase of the tower, the project’s vegetated

courtyard was connected to a public garden attached to it in order to create a sequence

of open vegetated areas crossing the complex and adding additional quality to it.

 

Client:         Har Hotzvim Property Corporation (J.T.P)

Location:    Har Hotzvim industrial park, Jerusalem

Area:           81,500 square meters

J.T.P Har Hotzvim by Kolker Epstein Architects
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
JTP Har Hotzvim
Other projects
J.T.P Har Hotzvim
1/13

J.T.P Har Hotzvim

Har Hotzvim property corporation (owned by J.T.P) bought the former Luz Corporation plot. The company’s administration building, used at the early stages of the project as a rental building for industrial uses (building A) already existed on the plot. In the first stage, a shell building for

rent (building B) was built on an area of approximately 28,000 square meters, and a parking garage with 1,000 spaces.

This building was planned as an efficient shell for the rental of spaces for offices and high tech industries. The depth of the story is 33 meters and its length is 180 meters. 3 separate entrance areas were built allowing division and flexibility in the size of the rental unit. Due to topography, the roof of the parking structure serves as an entry courtyard to this building, at street level. The courtyard is vegetated and in conjunction with the roof of building A constitutes a large continuous courtyard that comprises most of the open area for the entire project.

After completing the first phase, the office was invited to realize the existing building rights and expand them by an additional 25,000 square meters. after the city plan was approved, an additional building (C/D) was built, comprising of a 19-story tower and an additional 3-story wing. From this building the main entrance to the project was planned, from which there would be access to each of the plot’s built components. The tower was planned as an efficient tower for rental to high tech industries in a simple 33×33 meter square plan. The floor was planned as an efficient floor with a low gross/net ratio allowing a range of division options. The relatively “short” tower required architectural means to enhance its verticality, for that purpose the main facades were split using glazed screens with the emphasized vertical division.

The glazing, on the south and west facades, was planned with a fixed shading system hanging in front of it. This system prevents the sun heating of the glass screen and thus saves a great deal of energy in cooling the building on hot days. This is the first tall building in Israel where a shading screen was installed over the entire facade. In addition to saving energy, the screen provides an accessible system allowing simple cleaning of the glass. At the construction phase of the tower, the project’s vegetated courtyard was connected to a public garden attached to it in order to create a sequence of open vegetated areas crossing the complex and adding additional quality to it.

 

Client:         Har Hotzvim Property Corporation (J.T.P)

Location:    Har Hotzvim industrial park, Jerusalem

Area:           81,500 square meters

Recent Comments

    Archives

    Categories

    • No categories

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    • Projects
    • About
    • Partners
    • The Team
    • Contact
    • עברית
    • Projects
    • About
    • Partners
    • The Team
    • Contact
    • עברית
    Facebook Instagram
    • Projects
    • About
    • Partners
    • The Team
    • Contact
    • עברית
    • Projects
    • About
    • Partners
    • The Team
    • Contact
    • עברית
    Skip to content
    Open toolbar Accessibility Tools

    Accessibility Tools

    • Increase TextIncrease Text
    • Decrease TextDecrease Text
    • GrayscaleGrayscale
    • High ContrastHigh Contrast
    • Negative ContrastNegative Contrast
    • Light BackgroundLight Background
    • Links UnderlineLinks Underline
    • Readable FontReadable Font
    • Reset Reset